Destin · Miramar Beach · Walton and Okaloosa
EV Charger Installation in Destin and Miramar Beach
Florida Chargers installs networked Tesla Universal Wall Connectors at Destin and Miramar Beach resort condominiums, vacation-rental buildings, and hotel properties along the 98 corridor and Scenic Gulf Drive.

In Destin and Miramar Beach, the utility question has to be answered before anything else. Two resort properties a few miles apart on Scenic Gulf Drive and Highway 98 can be on different systems, and that single fact decides whether a make-ready credit is part of the budget or not.
Florida Chargers is a veteran-owned, Tesla Certified commercial EV charging reseller and installer working the Emerald Coast under FL Certified Electrical Contractor license EC13009718. Florida Chargers designs, installs, manages, and maintains Level 2 charging for resort condominium associations, vacation-rental buildings, and hotels, including the networked billing and driver support that a property with weekly guest turnover cannot staff internally.
The guests arriving here already drive electric. Florida has 450,400 registered EVs, second only to California's 1,843,100, out of 5,689,100 nationwide, per U.S. Department of Energy Alternative Fuels Data Center 2025 data, and Destin's drive market reaches deep into Alabama, Georgia, Tennessee, and Louisiana.
What Florida Chargers installs in Destin and Miramar Beach
The hardware is the Tesla Universal Wall Connector: a Level 2 unit rated at 48 amps and 11.5 kW, with a NACS connector and a built-in J1772 adapter. It plugs straight into a Tesla and charges every other major EV brand through the adapter that is already attached, so a property is not choosing a charger that serves one brand of car. Load sharing spreads available circuit capacity across multiple ports, which is what keeps a project from turning into a service upgrade.
Florida Chargers designs, installs, manages, and maintains the system, and the chargers list on the Tesla app so nearby drivers are routed to the property.
Resort properties usually want charging visible from the arrival path rather than tucked behind the building, both as a signal to guests and to keep cable management simple. Load sharing lets a property place four to eight ports in that visible area without pulling a new feeder across the site.
A common starting point for multifamily is roughly one Level 2 port per 20 to 30 units, then adding ports as usage data comes in.
Who this is for in Destin and Miramar Beach
Resort condominiums. The mid- and high-rise resort condominium properties along Scenic Gulf Drive, Holiday Isle, and the Sandestin area operate as hotels in practice and as associations on paper. Guest-facing amenities get judged on booking sites, and the board still has to approve the work through the declaration. That combination is where most of the process time goes, and it is why the electrical design and the association review should run in parallel rather than in sequence.
Vacation-rental-heavy buildings. A building where most units are in short-term rental programs has arrival-day demand spikes: several vehicles plugging in on the same Saturday afternoon. Networked charging with load sharing handles that better than a handful of unmanaged outlets, and session billing means the guest pays rather than the association absorbing the electricity. Because the chargers list on the Tesla app, drivers searching for charging near Destin see the property before they book.
Hotel properties. Along the 98 corridor, hotels compete for the same drive-market guest as the rental condos. Hilton's Jean Garris Hand told Skift in 2025 that EV charging is the highest-converting amenity on Hilton.com. For a Destin hotel, the booking effect generally outweighs session revenue, and dwell times are long enough that Level 2 charging fully serves the guest overnight.
Association governance. For the condominium side, Fla. Stat. 718.113(8) says the board may not unreasonably deny a unit owner's written request to install a charger in the owner's designated parking space, and Fla. Stat. 718.113(9) says board installation on the common elements is not a material alteration, so it generally does not require a full membership vote. Chapter 718 governs condominiums and Chapter 720 governs HOAs, so neither provision applies to an HOA or a rental apartment community. Many declarations contain their own material-alteration provisions, and resort declarations are often specific about common-element and exterior changes, so confirm with association counsel.
Your utility and what it pays for
Florida Power & Light serves much of the Destin and Miramar Beach area. Choctawhatchee Electric Cooperative, CHELCO, serves parts of Walton and Okaloosa counties. Confirm the meter.
Where the property is on FPL, the FPL EVolution Make-Ready Credit is open and provides up to $1,200 per port for Level 2 charging, first-come until the program budget is depleted. FPL's own materials state that credits are no longer available once the budget is depleted. It is the best active program in Florida. Where the property is on CHELCO, the make-ready assumption does not carry over, which is exactly why Florida Chargers verifies the serving utility at the meter during the site assessment instead of inferring it from the address.
Florida SB 1084 (2024) preempted EV-charger regulation to the state of Florida. No city or county in Florida can impose its own EV charging mandate, and there are no municipal rebate programs. That is a good thing for a board or an owner: a property installs charging because the amenity economics work, not because a local ordinance forced the decision.
Permitting and timeline
Electrical permits for properties inside the city limits are issued by the City of Destin. Miramar Beach is unincorporated, so those properties permit through Walton County, and addresses west of the county line permit through Okaloosa County. Resort associations typically add their own architectural review, which is best started at the same time as the permit set rather than after it.
A typical project runs 6 to 12 weeks from signed agreement to energized chargers. That window covers design, permitting, utility coordination, installation, and commissioning. Florida Chargers pulls the electrical permit under FL Certified Electrical Contractor license EC13009718.
What it costs
Installed cost runs $5,000 to $8,000 per port before incentives. The spread comes from trenching distance to the panel, available panel capacity, wall-mounted versus pedestal placement, port count, and whether the path is concrete or landscaping.
Resort properties with covered or ground-level structured parking usually land in the lower half of that range. Sites where guest parking sits across a driveway from the electrical room, or where landscaping and pavers have to be restored to resort standard, run higher.
Under the Share the revenue program, Florida Chargers co-invests and owns and operates the chargers. The property pays little to nothing upfront and earns a recurring share of the charging revenue. Financing is also available for qualified properties to lease the electrical infrastructure and installation with no money down. Exact economics are confirmed during the free site assessment.
To model the numbers for a specific property, use the EV charging ROI calculator.
Destin and Miramar Beach EV charging questions
This is for informational purposes only and does not constitute legal advice. Consult a licensed Florida attorney for guidance specific to your association.
Keep reading
- Commercial EV charging in Florida
Statewide overview of hardware, programs, and installation scope.
- EV charging ROI calculator
Model ports, usage, and revenue with hotel or multifamily inputs.
- EV charging for Florida hotels and resorts
Booking conversion, guest expectations, and resort installations.
- Panama City Beach installation
Beachfront condo towers with structured parking, an hour east.
- Hotel EV charging installation
Tesla app visibility and revenue models for hotel properties.
Get a straight number for your Destin and Miramar Beach property
Florida Chargers walks the parking, checks the panel, confirms the serving utility, and returns a board-ready proposal. Veteran-owned, FL Certified Electrical Contractor EC13009718. Call 321-467-2099 or email info@flchargers.com.
Request a free site assessment