Miami-Dade · FPL territory
Miami-Dade Commercial EV Charging and the FPL EVolution Make-Ready Credit for Multifamily
Florida Chargers installs networked Tesla Universal Wall Connectors at Miami-Dade apartment and condominium properties and files the FPL EVolution make-ready paperwork as part of the project.

Most of Miami-Dade County is FPL territory, which makes the FPL EVolution Make-Ready Credit the first line item to check on a multifamily charging budget. The credit provides up to $1,200 per Level 2 port toward make-ready electrical work and is awarded first-come until the program budget is depleted.
Florida Chargers is a veteran-owned, Tesla Certified commercial EV charging reseller and installer based in Winter Garden, FL, holding FL Certified Electrical Contractor license EC13009718. Florida Chargers designs, installs, manages, and maintains Level 2 charging for Miami-Dade apartment owners, condominium associations, and mixed-use properties, and handles the FPL application as part of each project.
Because the credit is first-come, timing matters. A property that completes its site assessment and application early has a better chance at available budget than one that waits for a full design cycle before applying.
What Florida Chargers installs in Miami-Dade
The hardware is the Tesla Universal Wall Connector: a Level 2 unit rated at 48 amps and 11.5 kW, with a NACS connector and a built-in J1772 adapter. It plugs straight into a Tesla and charges every other major EV brand through the adapter that is already attached, so a property is not choosing a charger that serves one brand of car. Load sharing spreads available circuit capacity across multiple ports, which is what keeps a project from turning into a service upgrade.
Florida Chargers designs, installs, manages, and maintains the system, and the chargers are eligible for listing in the Tesla app once commissioned by a Tesla Certified Installer with reliable connectivity (Tesla makes the final listing decision), so nearby drivers can be routed to the property.
Miami-Dade multifamily is heavily garage-parked, and many garages have the electrical room on the same level as the parking. Wall-mounted connectors with short conduit runs and load sharing are usually the lowest-cost layout in that setting.
A common starting point for multifamily is roughly one Level 2 port per 20 to 30 units, then adding ports as usage data comes in.
Who this is for in Miami-Dade
Apartment communities. Rental properties in Doral, Kendall, Brickell, Wynwood, Aventura, and Miami Gardens decide on charging at the owner level. Fla. Stat. 718.113 governs condominiums, not rental apartments, so no board vote is involved. A common sizing starting point is roughly one Level 2 port per 20 to 30 units. See apartment EV charging in Florida.
Condominium associations. Under Fla. Stat. 718.113(9), an association installation on the common elements is not a material alteration, so a board can generally add common-area charging without a membership vote. See the Florida condominium EV charger law guide.
Mixed-use and office. Mixed-use buildings combine overnight resident charging with daytime office and retail use, which spreads utilization across the day. See office and workplace EV charging.
How the FPL EVolution Make-Ready Credit works for multifamily
FPL's EVolution Make-Ready Credit provides up to $1,200 per Level 2 port toward make-ready electrical work, first-come until the program budget is depleted. On a 10-port multifamily project, a credit at the top of that range offsets up to $12,000 of make-ready cost. The credit does not pay for the charging hardware; on a Florida Chargers project, Tesla Wall Connector hardware is included in the installation price.
Most of Miami-Dade is served by FPL, but not every meter. The City of Homestead operates its own municipal electric utility, for example. Florida Chargers confirms the serving utility at the meter during the site assessment and prepares and files the FPL paperwork for eligible properties.
Florida SB 1084 (2024) preempted the regulation of EV charging stations to the state; since July 1, 2024, local governments may not enact or enforce their own EV-charging ordinances. The electrical permit itself is still issued locally. That is a good thing for a board or an owner: a property installs charging because the amenity economics work, not because a local ordinance forced the decision.
Permitting and timeline
Electrical permits are issued by the municipality where the property sits, such as the City of Miami, Miami Beach, Doral, or Aventura, or by Miami-Dade County for unincorporated areas. Florida SB 1084 (2024) preempted the regulation of EV charging stations to the state; since July 1, 2024, local governments may not enact or enforce their own EV-charging ordinances. The electrical permit itself is still issued locally.
A typical project runs 6 to 12 weeks from signed agreement to energized chargers. That window covers design, permitting, utility coordination, installation, and commissioning. Florida Chargers pulls the electrical permit under FL Certified Electrical Contractor license EC13009718.
What it costs
Installed cost runs $5,000 to $8,000 per port before incentives. The spread comes from trenching distance to the panel, available panel capacity, wall-mounted versus pedestal placement, port count, and whether the path is concrete or landscaping.
Typical installed cost runs $5,000 to $8,000 per port before incentives. Garage installs with a nearby panel usually land lower in that range; surface lots that require trenching through pavers or concrete land higher. The FPL credit is applied against make-ready cost after approval, not assumed in advance.
Under Share the Revenue, the property invests in the professional installation and Florida Chargers owns and operates the chargers — then the property earns 50% of net charging profit for the full term. Tesla Wall Connector hardware is included. Financing is available for qualified properties to cover the electrical infrastructure and installation with no money down, so a project can start without a capital outlay from reserves or a special assessment. Exact economics are confirmed during the free site assessment.
To model the numbers for a specific property, use the EV charging ROI calculator.
Miami-Dade EV charging questions
This is for informational purposes only and does not constitute legal advice. Consult a licensed Florida attorney for guidance specific to your association.
Keep reading
- Florida utility EV charging credits
FPL EVolution and Duke Energy Florida Charger Prep, side by side.
- How many chargers a multifamily property needs
Sizing ratios and first-phase planning.
- Switching from ChargePoint
Replacing subscription-based chargers.
- Tampa EV charger installation
Duke Energy Florida and Tampa Electric territory.
- EV charging ROI calculator
Model the property's 50% share of net charging profit.
Get a straight number for your Miami-Dade property
Florida Chargers walks the parking, checks the panel, confirms the serving utility, and returns a board-ready proposal. Veteran-owned, FL Certified Electrical Contractor EC13009718. Call 321-475-2689 or email info@flchargers.com.
Request a free site assessment