Florida Chargers · Guide
Office and Workplace EV Charging Installation in Florida
Office charging is a different buy from hotel charging. The decision-maker is the building owner or commercial asset manager, the cars park during the workday instead of overnight, and the billing question is how employees and visitors pay. Florida Chargers designs workplace Level 2 charging around those three facts.
A different buyer than hotels
A hotel GM buys charging to win bookings from drive-market guests. An office building owner or CAM buys charging to support leasing, renewals, and tenant requests. The office case is measured in tenant retention and lease conversations, and the decision is usually made by ownership rather than by on-site operations. For hotel properties, see hotel EV charging.
Daytime dwell and Florida peak load
Office parking turns over on a weekday schedule: arrivals between 7 and 9 a.m., departures between 4 and 6 p.m. That eight-hour dwell suits Level 2 charging. It also overlaps with the Florida afternoon HVAC peak, which is why Florida Chargers sizes office projects with a load study rather than a nameplate guess. Networked Tesla Universal Wall Connectors share available circuit capacity across ports, so a first phase can often run on existing service.
How employees and visitors pay
Florida Chargers enrolls the site in Tesla for Business and sets a pay-per-use price with the building owner. Employees and visitors both pay per session through the Tesla app, so the building does not handle billing. If a building wants employee-only access, sponsored charging for a tenant, or different rates for different groups, Florida Chargers confirms during the site assessment what the network supports for that site before it goes into a proposal.
Under Share the Revenue, the property invests in the professional installation, Florida Chargers owns and operates the chargers, and the property earns 50% of net charging profit for the full term. Tesla Wall Connector hardware is included. Financing is available for qualified properties to cover the electrical infrastructure and installation with no money down.
Cost, utilities, and timeline
Typical installed cost runs $5,000 to $8,000 per port before incentives. FPL's EVolution Make-Ready Credit provides up to $1,200 per Level 2 port, first-come until the program budget is depleted. Duke Energy Florida's Commercial Charger Prep Credit covers wiring, panel, and conduit, not hardware or permits. Typical timeline is 6 to 12 weeks from signed agreement to energized chargers. Florida Chargers serves offices in Orlando, Tampa Bay, Miami-Dade, and across FL, GA, AL, SC, and NC. Properties replacing subscription chargers can review ChargePoint migration.
Free site assessment with load study
Florida Chargers walks the parking, reviews the panel and utility interval data, and returns a written proposal with a sized first phase, pay-per-use pricing setup, and applicable utility credits.
Frequently asked questions
Ready for a real number on your property?
Free site assessment — we'll walk the parking, check the electrical, and give you a straight, board-ready proposal.
Request a free site assessment