Does EV Charging Belong in Your Condo's Reserve Study?
A Florida condo board in 2026 can be working from a reserve schedule that did not exist five years ago. The structural integrity reserve study is finished, or it is being scheduled.
Then someone asks about EV charging. The question that follows is whether this ends up on the study too.
Short answer: the structural integrity reserve study has a specific statutory list of items it must cover, and EV charging equipment is not one of them by name. Whether any part of a charging project reaches the study depends on the catch-all item at the end of that list, which carries two conditions rather than one, and on which components the association is responsible for under its declaration of condominium. Those are questions for the reserve professional performing the study and for association counsel.
What the study actually has to cover
The requirement sits in Fla. Stat. 718.112(2)(g). Under the 2026 Florida Statutes, a residential condominium association must have a structural integrity reserve study completed at least every 10 years after the condominium's creation, for each building on the condominium property that is three habitable stories or higher in height, as determined by the Florida Building Code. The paragraph does not apply to buildings less than three stories in height.
That height test belongs to paragraph (g) alone. The reserve requirements in paragraph (f) carry no height condition, so a building below the threshold is not exempt from reserves generally -- its reserves are simply not set by a structural integrity reserve study.
The study is based on a visual inspection of the condominium property. That phrasing matters, and it comes back below.
The statute then lists the items the study must include, at a minimum, as related to the structural integrity and safety of the building:
- Roof
- Structure, including load-bearing walls and other primary structural members and primary structural systems
- Fireproofing and fire protection systems
- Plumbing
- Electrical systems
- Waterproofing and exterior painting
- Windows and exterior doors
- Any other item with a deferred maintenance expense or replacement cost exceeding $25,000, or the inflation-adjusted amount determined by the division, whichever is greater
Seven named building systems and one catch-all. EV charging equipment does not appear on that list by name.
Electrical systems are on the list, so does that settle it?
It does not, and this is where a board can talk itself into an answer quickly. Electrical systems are item five on that list, an EV charger runs on electricity, and the inference feels obvious.
Two things in the statute's own wording cut against reading it that fast. The list is introduced as the items the study must include as related to the structural integrity and safety of the building, which is a qualifier on every item in it. And the statute does not define where a building's electrical system ends and a piece of equipment served by it begins, nor does it mention EV charging anywhere in the paragraph. Where that line falls at a particular property is a judgment made on the facts of the building, which is what the visual inspection goes to. A board that wants a defensible answer gets it in writing from the professional performing the study, not from whoever is selling the chargers.
The catch-all item has two conditions, not one
The eighth item is easy to read as a dollar test on its own: if it costs more than $25,000, it goes in the study. The statutory text stacks a second condition on the first.
An item qualifies if it has a deferred maintenance expense or replacement cost exceeding $25,000, or the inflation-adjusted amount determined by the division, whichever is greater, and the failure to replace or maintain that item negatively affects the items listed above it, as determined by the visual inspection portion of the study.
Both conditions have to be met. A line item can clear the dollar threshold comfortably and still sit outside the catch-all, if letting it go would not affect the systems listed above it.
Florida Chargers puts installed cost at $5,000 to $8,000 per port before incentives, so the dollar side of that test is reachable on a multi-port project. The second condition is the one doing the real work, and it is answered by inspection rather than by arithmetic.
The phrase that decides what a board has to fund
There is a separate question underneath all of this, and it is the easiest one to skip.
The funding obligation sits in Fla. Stat. 718.112(2)(f)2.a., and it says reserves must be maintained for the items identified in paragraph (g) for which the association is responsible pursuant to the declaration of condominium.
The declaration. Not the board minutes, not a vendor agreement, and not an installer's description of its own program.
The same sub-subparagraph adds a qualifier worth knowing. Where an item's useful life is not readily ascertainable, or its estimated remaining useful life exceeds 25 years, an association is not required to reserve replacement costs for that item, though it must still reserve any deferred maintenance expense the study recommends.
That flexibility is narrower now. For a budget adopted on or after December 31, 2024, the members of a unit-owner-controlled association that must obtain a structural integrity reserve study may not determine to provide no reserves or less reserves than required for the items listed in paragraph (g) -- except for members of an association operating a multicondominium, where the division has approved an alternative funding method.
Where the charging agreement sits in that question
Under Share the Revenue, the property invests in the professional installation and Florida Chargers owns and operates the chargers. Tesla Wall Connector hardware is included. Financing is available for qualified properties to cover the electrical infrastructure and installation with no money down, so a project can start without a capital outlay from reserves or a special assessment. The property then shares in net charging profit for the full term, and the ROI calculator carries that arithmetic.
That structure is relevant to the question above. It is not an answer to it. Paragraph (f)2.a. turns on responsibility under the declaration, so a charging agreement is read alongside the declaration rather than in place of it.
The useful move is to stop asking about the project as one object. A charging install is conduit and trench, panel and distribution work, mounting hardware, and the chargers themselves. Those components can land in different places. A board that asks whether EV chargers are a reserve item is likely to get a worse answer than a board that asks which of those components the association is responsible for under its declaration, and what the study says about each.
These questions apply to any EV charging proposal a board reviews, including one from Florida Chargers.
What to put in front of the two people who can answer it
A board does not have to resolve this in a meeting. The practical step is to put the right material in front of the reserve professional and association counsel.
- For the reserve professional: the proposed scope of work, component by component, and the question of which of those components the study reaches and on what basis.
- For association counsel: how the declaration allocates responsibility for parking areas, garages, conduit and electrical distribution, and how the proposed agreement reads against it.
Two things are worth settling before either conversation. First, whether the install is a board decision at all: Fla. Stat. 718.113(9) provides that a board may make available, install, or operate EV charging stations on the common elements or association property, and that the installation, repair or maintenance of one under that subsection is not a material alteration or substantial addition. Second, the separate owner-side path: under Fla. Stat. 718.113(8), a declaration or restrictive covenant may not prohibit a unit owner from installing an EV charging station within the owner's limited common element or exclusively designated parking area, subject to the subsection's conditions. Those two subsections cover different situations, and a board packet should not blur them.
Many declarations contain their own material-alteration provisions; association counsel can confirm how they apply. Separately, who answers the phone when a charger fails is a contract question rather than a reserve question, and it is worth settling in the same pass -- see who fixes a condo EV charger that fails at 11 PM. For what the installation dollars go toward, see the cost breakdown for a Florida install.
The honest limit of this article
Nothing above tells a board whether its own project belongs in its own study. The statute sets a list, a threshold, a second condition and a responsibility test. Applying them to one building is done by a qualified reserve professional and by a lawyer reading a declaration. Any installer who answers it from a proposal is answering a question it was not asked to answer.
Florida Chargers is a veteran-owned, Tesla Certified commercial EV charging installer serving condominium associations across Florida, licensed as Florida Certified Electrical Contractor EC13009718. The component-by-component scope described above is what the reserve professional and the association's counsel each work from. Reach out for a no-pressure free site assessment.
Call 321-475-2689 or visit flchargers.com.
This article is for informational purposes only and does not constitute legal advice. It describes what the cited statutes say and does not tell any board how to apply them. Consult a licensed Florida attorney, and a qualified reserve professional, for guidance specific to your association.